Login

Skip to the practical guide

Better Equipped Technician Practical Essentials

Investigating transformers

Comparing measured AC voltage ratios with the number of turns in two coils

A quick-reference, four-chart guide for technicians preparing a GCSE transformer investigation: what to issue, how to connect two voltmeters, how to compare approved winding combinations and what to check before reuse. For more detailed curriculum practical resources, visit our Curriculum Experiments resources.

GCSE PhysicsTransformers · turns and voltage ratiosP24 · Technician referencev1.0 October 2026

Print all four charts on A4 portrait. Choose Save as PDF or your printer in the print window. Use 100% scale and turn off browser headers and footers.

To print, use your browser’s Print command: Ctrl+P (Windows) or Cmd+P (Mac).

Scope: a no-load voltage-ratio investigation with separate primary and secondary windings on a closed iron core. The base issue keeps the primary fixed and uses one tapped secondary with several approved turn counts. It supports AQA GCSE Physics 8463, section 4.7.3.4: separate Physics, Higher Tier, not an additional named required practical. [1] [8] P24 is a Better Equipped planning code. The seven-lead arrangement, tap sequence and quantity allowances are editorial choices requiring a local pilot. Mains-connected windings, high-voltage outputs, short-circuit tests and loaded efficiency measurements are outside this method.
Use the AC outputIsolated low-voltage source; checked protection
Two voltage measurementsOne AC voltmeter across each winding
Check every tapInclude unused winding sections
Power off before changesDo not move a live core or connection
Ratio, not efficiencyNo added load in the core method
Better EquippedTechnician Practical EssentialsP24 · GCSE Physics

Investigating transformers

The practical at a glance

Check ratings → assemble unpowered → measure both voltages → change taps → repeat and compare

Investigating transformers methdology
AC input onlyuse the approved source and frequency
Measure Vp and Vsrecord the actual pair for every tap
Vs/Vp ≈ Ns/Npcompare with the ideal turns-ratio model
Worked approach: keep one primary, a closed core and the source frequency unchanged. Select approved taps on a separate secondary; connect only a high-input-resistance AC voltmeter to that winding. This is a no-added-load comparison, not a power test. [2]
  1. Approve and pilotInspect the coils, core, leads and supply. Staff check frequency, winding ratings, over-current protection and the highest possible voltage across all taps, including unused sections. Agree the input, on-time and cooling rule.
  2. Assemble with output offFit the fixed primary and tapped secondary on the same core. Close and secure the core as instructed; label the primary terminals and approved secondary pairs. Keep fingers clear of clamping points. Never open the core while powered. [9]
  3. Connect the two metersConnect AC output → switch → primary → AC return. Put one AC voltmeter across the primary and another across the selected secondary pair. Use voltage sockets, not A/mA inputs. Keep the two winding circuits electrically separate. [4]
  4. Take the first voltage pairSwitch on only at the approved setting. Record Np, the actual turns Ns between the selected terminals, and measured Vp and Vs in volts. Take settled readings within the permitted on-time; do not substitute the supply dial value.
  5. Change the secondary safelySwitch the output off and follow the isolation procedure before moving a lead. Select the next approved terminal pair; never bridge unused taps. Keep primary turns, core closure and frequency fixed. Restore the same target Vp and record its actual value.
  6. Repeat the complete seriesWork through all approved tap pairs, switching off between readings and allowing cooling as agreed. Repeat the whole series from comparable conditions; three series per set is the planning example. Keep every measured pair.
  7. Compare the ratiosFor each pair calculate Vs/Vp and Ns/Np. Plot measured voltage ratio vertically against turns ratio horizontally and compare with y = x. Discuss departures and repeat spread; do not call voltage ratio an efficiency. [1] [7]
Low input does not guarantee a low output. Use only staff-approved extra-low-voltage combinations. Never connect an experimental winding directly to mains, substitute DC, short the secondary or bypass protection. For heating, smell, a trip or an unexpected voltage, switch off if safe and alert staff. [3] [6]
Better EquippedTechnician Practical EssentialsP24 · GCSE Physics

Apparatus and materials

One reusable transformer station · repeat series reuse the core, windings and meters

 
Interactive calculator not active. Fixed example: 10 stations + 1 extra set, three series per set, 20% spare leads and 10% spare sheets. Prepare 11 complete sets, 22 voltmeters, 93 leads and 37 series sheets. Adjust manually when scripting is unavailable.

Planning issue: 10 working stations + 1 extra = 11 equipped sets; 3 complete tap-comparison series per set = 33 series. AC voltmeters: 22. Leads: 77 working + 16 spares = 93. Record sheets: 33 working + 4 spares = 37. Reuse the core and coils; supply protection, cooling time and electrical capacity are planned separately.

Tick prepared items. Repeats multiply record sheets, not reusable apparatus. Meter totals are twice the equipped-set count.
Item / issue specification Per equipped set Class provision (11 sets)
1 complete core set 11
1 11
1 11
1 11
2 22
1 11
7 + class spares 93
(77 + 16 spare)
1 station kit 11 kits
3 records 37 sheets
(33 + 4 spare)

Prepare separately

Book staff test equipment, any additional current monitoring, safe cooling space and person-based PPE. Confirm simultaneous class demand and the protection of each station.

Different equipment changes the issue

Separate secondary coils need one of every chosen turn count per set, not one coil. Integral leads, a double-pole switch or additional meters change the seven-lead allowance.

Repeat basis: a series is a complete pass through the approved tap list. Repeated display readings without resetting are not independent series. No lamps, resistive loads or shorting links are included.
Better EquippedTechnician Practical EssentialsP24 · GCSE Physics

Preparation and apparatus set-up

Check every winding section · close the core · connect each voltmeter in parallel

Investigating transformers set up

1 · Identify and assess

Confirm coil IDs, the primary turn count and each approved secondary pair. Check the full winding and unused sections as well as the measured output; label limits and protect terminals.

2 · Prove the connections

With the output off, trace the primary loop and both parallel meter branches. Confirm AC voltage ranges, separate winding circuits and a fully closed, secured core.

3 · Pilot every combination

Staff verify output voltage, primary current and heating for every approved configuration. Agree a readable input, on-time, cooling intervals and a shutdown response before issue.

Primary path: isolated AC output → switch → primary winding → AC return.
Voltage branches: meter 1 across the primary terminals; meter 2 across the selected secondary terminals. No wire joins the primary circuit to the secondary circuit. No added secondary load.
Checks before energising
Part Required check Avoid
Core / windings Core closed; coils supported; primary identity fixed. Opening the yoke live or trapping insulation.
Supply / taps Approved AC input; all secondary sections checked. DC, mains, unchecked step-up or shorted taps.
Both voltmeters AC volts; appropriate range; V/COM connections. Current inputs, a series voltmeter or a shared-earth link.
Measurement Same Np, frequency and core; record actual Vp and Vs. Changing several factors or trusting the supply dial.

Use the connected turns

Ns is the number of turns between the two terminals in use, not automatically the coil’s total turns. Confirm the manufacturer’s tap labels; do not add or subtract labels without checking their meaning.

Define “no load”

The secondary has no lamp or resistor attached. Its high-input-resistance voltmeter still draws a small current. Keep meter loading and ranges suitable for the small AC signals; the primary can still draw current.

Recording prompt — expand for every approved pair and repeat series
Tap pair / Ns Vp (V) Vs (V) Ns/Np Vs/Vp Notes
A: ____ / ____ ____ ____ ____ ____ ____
B: ____ / ____ ____ ____ ____ ____ ____
C: ____ / ____ ____ ____ ____ ____ ____

Primary ID / Np: __________   Frequency: __________   Meter ranges: __________
Use measured AC voltage magnitudes consistently. Ratio calculations require a valid, non-zero Vp.

Approved input / all-tap limits: __________On-time / cooling: __________Pilot / method: __________
Better EquippedTechnician Practical EssentialsP24 · GCSE Physics

Troubleshooting and clear-down

Check AC, terminal pairs and core closure first · switch off before any adjustment

Problem What to check Technician action
Little or no secondary voltage DC selected, open winding, wrong meter mode, loose lead or incorrect taps. Switch off. Staff trace the circuit and use known-good equipment; do not simply increase the input.
Voltage ratio far from prediction Wrong turn count, poor core closure, unsuitable meter range/loading or changed Vp. Verify the connected turns and record both voltages. Reassemble only with power off; retain anomalous readings.
Input falls or protection trips Incorrect primary, unsuitable frequency/input, shorted turns, open core or accidental load. Switch off and isolate for staff checks. Never bypass protection or fit a larger fuse to force a result.
Readings drift between repeats Warming, supply variation, loose contacts or changed core position. Follow cooling/reset rules, restore the layout and remeasure Vp. Report repeat spread rather than selecting a preferred value.
Unexpectedly high output / overrange Unapproved tap pair, windings exchanged or full secondary turns overlooked. Switch off immediately if safe. Staff reassess every winding section before reconnecting; do not probe at random.
Hot coil/core, smell, damage or loud new vibration Excess input/on-time, saturation, damaged insulation or loose clamping. Switch off if safe, keep clear and alert staff. Allow cooling, remove faulty kit and record the fault.
Interpret the result: voltage ratio tests the transformer model; it does not measure energy efficiency. Coupling, winding resistance and measurement limitations can affect agreement. Explain the difference between a model and the observed ratios. [3] [7]
Power off does not mean cool. Leave the core and windings supported until staff confirm safe handling. Never remove the yoke while energised or use a secondary short circuit as a classroom fault test. Keep the source off while altering terminals. [6] [9]

Clear-down and reset

01 · Switch off and retainOpen the switch, turn off the output and follow the isolation procedure. Keep all voltage pairs, tap labels and notes about drift or faults.
02 · Cool and inspectWait for safe handling. Check coil insulation, terminal covers, leads, core faces and securing hardware. Do not test temperature by touch.
03 · Return and recordDisconnect carefully. Store matched cores and coils with their turn labels. Restore meter settings for storage, leave supplies off and log faults.
Prepared by: __________Method / assessment: __________Ratings / cooling checked: __________

Reference check: 21 October 2026. AQA curriculum [1] [8]; PHYWE and UNSW transformer background [2] [3]; Fluke voltage inputs [4]; HSE electrical precautions [5] [6]; PASCO power distinction [7]; PHYWE core-opening warning [9]. Full source notes are below the printable area.

The tapped-secondary issue, seven-lead circuit and repeat allocation are editorial choices requiring local approval and a complete pilot. No external organisation has approved this guide.

More practical support from Better Equipped

Explore buying guides, practical resources and laboratory reference information.

Visit Better Resources →

About this guide

This Technician Practical Essentials guide brings together apparatus issue, transformer preparation, AC-voltage measurements, ratio comparisons and clear-down for school science technicians. It complements our Curriculum Experiments resources.

Source basis and adaptation: the established P01/P20–P23 template supplies the layout, calculator approach and four-chart print format. Transformer content is newly written using the references below. The fixed-primary/tapped-secondary route, two meters, seven leads and repeat allocation are preparation choices, not a verbatim source procedure or a validated kit specification.

What this practical investigates

A varying magnetic flux links two windings. With an AC-driven primary and suitable core, a secondary voltage is induced. The ideal relationship is Vs/Vp = Ns/Np; this guide compares measured magnitudes with that model. [1] [3] The specified AQA mapping is separate Physics, Higher Tier. Check other qualifications independently.

The base method changes only the connected secondary turn count, using several approved taps while retaining the primary, core and frequency. PHYWE describes related open-circuit voltage comparisons. [2] The seven-lead count assumes a separate primary switch and two independent voltage meters; it does not include a current-monitoring branch.

Two useful ratios

Ideal comparison

Turns ratio k = Ns/NpMeasured ratio q = Vs/VpBoth ratios are dimensionless. The ideal comparison is q = k. At fixed Vp, secondary voltage is predicted to increase with secondary turns. [1]

Keep measured input in the calculation

Use each row’s actual Vp; reject a ratio calculation when the input is zero, invalid or unresolved. Plot q against k and keep every point. Do not force measured results onto the ideal line or replace them with predicted values.

Arithmetic illustration only — not settings or observed data: for Np = 400, Ns = 200 and measured Vp = 2.00 V, the ideal prediction is Vs = 1.00 V. An illustrative measured 0.96 V would give q = 0.48 against k = 0.50. The 4% relative ratio difference is not a transformer efficiency.

Check the whole winding, not just the chosen output

A tap gives access to part of a winding; another section may have a larger induced voltage. Staff should identify all winding sections and estimate the highest output using the largest relevant turns ratio, then verify the actual arrangement within approved limits. This is an application of the turns-ratio model, not a guarantee that a calculated value establishes safety. [1] [2]

For a first issue, staff can restrict the tap list to step-down or equal-turn comparisons. A step-up example needs a separately checked voltage envelope, meter range and winding rating. Do not simply exchange coil roles: the new primary must suit the applied voltage and frequency. [3] Never use an exposed mains winding or a high-turn coil that can generate an unapproved output. Leave unselected taps unconnected and protected, not linked together.

AC, meters and core closure

Use a compatible AC source

The method calls for an isolated, protected low-voltage sinusoidal AC output and a compatible transformer kit. A supply with both AC and DC terminals must be connected to the correct output. No DC comparison is included. Staff approve the actual voltage, frequency, current protection and operating duration.

Measure voltage across each winding

Use the AC voltage function and voltage input sockets. A meter lead left in an A/mA socket can short the circuit when connected across a winding. [4] Check low-voltage resolution and frequency suitability; use independent battery-powered meters or an approved isolated measurement arrangement.

Keep the core closed while powered. Opening the magnetic path can increase primary current. [9] The core condition is a controlled factor here, not an invitation to lift the yoke during operation. Any core-comparison demonstration needs a separately assessed method, with power off for every change.

Why the voltage test is not an efficiency test

The secondary is unloaded apart from its voltmeter, while the primary can still draw an excitation current. A close voltage-ratio match does not demonstrate zero losses. Real efficiency compares useful output power with input power under defined load conditions; AC phase relationships matter. [3] [7]

Do not treat Vrms × Irms as measured real input power without checking the conditions. An approved loaded extension needs suitable loads and instruments and a method that accounts for power factor; it is not obtained by adding an ammeter to this issue. [7]

Optional variants — plan separately

Extensions are not included in the calculator
Variant What changes Preparation consequence
Change input voltage Keep the same winding pair; compare several approved inputs. Recheck every possible secondary voltage; record actual input each time.
Separate secondary coils Replace a tapped coil with different complete secondaries. Add all required coils, label turns and repeat core assembly checks with output off.
Step-up / load / core comparison Changes the voltage envelope, load or magnetic circuit. Use a new approved method and pilot; add rated components and instruments. No mains or short-circuit tests.

Worked preparation example

The fixed example below uses 10 working stations + 1 extra complete set, three full tap-comparison series per set, 20% spare leads and 10% spare record sheets. The live calculator updates Chart 2, not this explanatory example.

Reusable equipment and leads

10 + 1 = 11 equipped sets.
Two meters per set = 22 AC voltmeters.
7 × 11 = 77 working leads.
20% × 77 = 15.4 → 16 spare leads.
Total: 93 leads.

Repeat series and sheets

3 × 11 = 33 complete series.
One full sheet per series = 33 sheets.
10% × 33 = 3.3 → 4 spare sheets.
Total: 37 series-record sheets.
Reusable equipment is not multiplied by repeats.

One primary and one tapped secondary per set means 11 of each coil, not 11 of every possible tap. A different design may require more coil bodies or leads. The calculator does not predict safe input settings, output voltage, primary current, heating, available services or the time needed for cooling.

Have feedback or a useful technician tip? Please contact us.

Draft prepared: 21 October 2026 · Version: 1.0 · Technical review: pending confirmation before publication.

Everything you need for this practical

Build the issue around compatible transformer coils and a closed core, an isolated low-voltage AC source, appropriate protection and two suitable AC voltmeters. Confirm tap counts, frequency, winding ratings and all possible outputs before ordering. This is not a pre-approved kit.

Coils, cores and support — catalogue searches

AC supply, meters and connections — catalogue searches